To get the consultation
Ref-List PDF
Enterprise “UPG-Invest” TM “Syaivo” village of Panka
A TASK
Preparation of water to ensure the drinking regime of turkeys. Productivity 45m3/day, 7m3/h. Enterprise "UPG-Invest" TM "Syayvo". Growing turkeys, with Punk.
WATER SOURCE
Well group
PROBLEMS
Iron up to 13.5 mg/l, hydrogen sulfide 6.4 mg/l. (at a rate of 0.38)
SOLUTION
Water ozonation in the contact chamber, dosing of reagents of 2 types, iron removal at 2 filtration stages, removal of Cl, water conservation with Akvirs silver ionizer (own development, patent for invention received). Implementation - 2021
To get the consultation