Pool 8m * 4m in the hotel “Ribas”, Bukovel
![](https://aquacenter.com.ua/wp-content/uploads/2023/08/photo_2023-08-24_10-37-17-585x354.jpg)
A TASK
Design, construction of the pool. Pool 8m * 4m in the hotel "Ribas", Bukovel
SOLUTION
Issuance of the project, hydraulic piping of the bowl, laying of all communications in those. premises, installation of equipment. The project was implemented in 2020.
![](https://aquacenter.com.ua/wp-content/uploads/2023/07/part1.png)
![](https://aquacenter.com.ua/wp-content/uploads/2023/07/part2.png)
![](https://aquacenter.com.ua/wp-content/uploads/2023/07/part3.png)
![](https://aquacenter.com.ua/wp-content/uploads/2023/07/part5.png)
![](https://aquacenter.com.ua/wp-content/uploads/2023/07/part4.png)